Case Studies
![SEWAGE TREATMENT PLANT 5650 MTR PERIMETER GUARD RAIL IN KSA](https://www.chemey.com/wp-content/uploads/2024/03/Saudi-Arabia-Handrails-1.jpg?v=1712659404)
SEWAGE TREATMENT PLANT 5650 MTR PERIMETER GUARD RAIL IN KSA
We recently had the opportunity to supply Endurail – All Aluminum Modular Guardrail and Handrail Structural fittings at the site of one of our prestigious customers in the Kingdom of Saudi Arabia. ( KSA ). The scope of the project was full perimeter protection of STP project buildings and treatment...
Read more![ALUMINUM HANDRAIL SURVEY CASE STUDY AFTER 3 YEARS FOR STP](https://www.chemey.com/wp-content/uploads/2024/03/IMG-20200209-WA0021.jpg?v=1712659403)
ALUMINUM HANDRAIL SURVEY CASE STUDY AFTER 3 YEARS FOR STP
Survey Date: 7 February 2022 Site: Bengaluru Water and Sewage Supply Board (BWSSB) Sewage treatment plant Location: Hulimau and KR Puram, Bangalore Handrail Issues Faced By STP’s Like all other STP’s – BWSSB were facing grave concern of periodical maintenance & replacement of MS Handrails at their STP’s at an interval...
Read more![DESALINATION PLANT PERIMETER RAILING – CONDITION ANALYSIS AFTER 5 YEARS](https://www.chemey.com/wp-content/uploads/2024/03/Sewagram-2016-Condition.jpg?v=1712659403)
DESALINATION PLANT PERIMETER RAILING – CONDITION ANALYSIS AFTER 5 YEARS
Customer Need: Area: Large cement plant Desalination plant Desal plant sea water treatment tanks handrail & perimeter security. The maintenance and civil department we refacing an issue of replacement & maintenance of MS handrail installed at the time of new plant due to severe corrosion. Problems: March 2016 Treating the new MS handrail with the...
Read more![Ahmedabad Municipal Corporation (AMC) – Sewer Pit Line Pumping Station Railings](https://www.chemey.com/wp-content/uploads/2024/02/Endurail-2021-1.jpg?v=1712659415)
Ahmedabad Municipal Corporation (AMC) – Sewer Pit Line Pumping Station Railings
Problem: Ahmedabad Municipal Corporation were facing grave concern of periodically replacing GI Handrails at their STP’s at an interval of every 3 years due to corrosion. SOLUTION THEY WERE WORKING ON: They were looking at an alternative option for replacing the Handrails at their Pirana STP, Ahmedabad. They had finalized...
Read more